Precautions to be taken while making entries in measurement book
1) Entries are made by J.E. and certified by S.D.O or A.E.
2) All entries are recorded in ink directly in M.B.
3) No entry is allowed to be erased.
4) If any correction is required, it must be initialed by the officer who made the measurement.
5) Measurements are taken in the presence of contractor, and his signature is taken in M.B.
6) Entries should be recorded continuously and no blank pages left or turn off. Any pages left blank should be cancelled by diagonal lines and signed by authority.
7) The M.B. contains name of work, name of contractor, date of measurement, location, date of work order, and number of measurements.
2) All entries are recorded in ink directly in M.B.
3) No entry is allowed to be erased.
4) If any correction is required, it must be initialed by the officer who made the measurement.
5) Measurements are taken in the presence of contractor, and his signature is taken in M.B.
6) Entries should be recorded continuously and no blank pages left or turn off. Any pages left blank should be cancelled by diagonal lines and signed by authority.
7) The M.B. contains name of work, name of contractor, date of measurement, location, date of work order, and number of measurements.
0 comments